Roofing, insulation, flashing, sealants and firestopping.
Roofing, waterproofing, insulation, flashing, sealants, firestopping and moisture protection.
- Div 07 Thermal & Moisture Protection
What you receive
Roof areas
Flashing & sealant lengths
Insulation quantities
04Interactive takeoff
Pick a takeoff layer. Every number below is calculated live from this illustrative plan, the same way our estimators measure your drawings.
Readout
168LF
Measured on centerline, corners counted once.
Exterior walls: 168 LF
Estimating output
Each line traces back to the highlighted elements on the drawing. Select a row to see what was measured.
| Layer | Method | Quantity |
|---|---|---|
| Measured on centerline, corners counted once. | 168 LF | |
| Partitions measured between wall faces at intersections. | 84 LF | |
| Room-by-room areas; hover a room to inspect it. | 1,664 SF | |
| Counted by type from the plan and door schedule. | 4 EA | |
| Counted and cross-checked against elevations. | 6 EA |
Sample data from an illustrative plan, not an actual project estimate.
Methodology
- 1
Project Document Review
We review drawings, specifications, addenda, scope documents and all available project information.
- 2
Scope & CSI Classification
Applicable trades are identified and the estimate is organized by scope and CSI division.
- 3
Digital Quantity Takeoff
Project components are measured and quantified with professional digital takeoff workflows in PlanSwift.
- 4
Pricing & Cost Development
Material, labor, equipment, subcontractor and other applicable cost components are developed.
- 5
Estimate Review
Quantities, calculations, scope coverage and estimate organization are reviewed before release.
- 6
Final Delivery
You receive a structured takeoff and/or estimate ready for review, budgeting and bid preparation.
Related services
Upload drawings and get a scoped quote for your takeoff or estimate.