Services

Quantity takeoff, cost estimation, bid preparation support and plan & drawing takeoff across architectural, structural, civil/site, MEP and specialty work.

01Services

Six core services, delivered as organized quantities and cost information you can use for bidding, budgeting, procurement and planning.

  1. COST BREAKDOWN · SAMPLEMaterial42%Labor33%Equipment12%Subcontractor13%EXTENDED COST = QTY × UNIT COST
    • Trade-wise estimate breakdowns
    • Material & labor summaries
    • Unit & extended costs
    Explore Construction Cost Estimation

02Trades & sectors

02CSI division coverage

Architectural, structural, civil/site, MEP and specialty work. Coverage is tailored to each project's drawings, specifications and scope. Select a division to see what's included.

Division 03 · Structural

Concrete

Foundations, slabs, cast-in-place concrete, reinforcing, formwork and concrete finishes.

Foundationsslabscast-in-place concretereinforcingformworkconcrete finishes

03How it works

  1. 1

    Project Document Review

    We review drawings, specifications, addenda, scope documents and all available project information.

    PDF A-101 Floor plan.pdf
    PDF S-201 Foundations.pdf
    PDF Specs & addenda.pdf
  2. 2

    Scope & CSI Classification

    Applicable trades are identified and the estimate is organized by scope and CSI division.

    01General Requirements
    02Existing Conditions
    03Concrete
    04Masonry
    05Metals
    06Wood, Plastics & Composites
    07Thermal & Moisture Protection
    08Openings
    09Finishes
    10Specialties
    11Equipment
    12Furnishings
    13Special Construction
    14Conveying Equipment
    21Fire Suppression
    22Plumbing
  3. 3

    Digital Quantity Takeoff

    Project components are measured and quantified with professional digital takeoff workflows in PlanSwift.

    ABCDBEDROOM 1BEDROOM 2KITCHENDININGLIVING
  4. 4

    Pricing & Cost Development

    Material, labor, equipment, subcontractor and other applicable cost components are developed.

    CodeItemQtyUnit
    03 30 00Slab on grade, 4"1,664SF
    03 30 00Concrete, slab22CY
    06 11 00Exterior wall framing168LF
    06 11 00Interior wall framing84LF
    09 29 00Gypsum board (both faces int.)3,024SF
    08 14 00Interior/exterior doors4EA
    08 50 00Windows6EA

    Material, labor & equipment costs are developed per scope. Quantities from the sample plan.

  5. 5

    Estimate Review

    Quantities, calculations, scope coverage and estimate organization are reviewed before release.

    • Quantities checked
    • Calculations audited
    • Scope coverage confirmed
    • Estimate organization reviewed
  6. 6

    Final Delivery

    You receive a structured takeoff and/or estimate ready for review, budgeting and bid preparation.

    Takeoff.xlsxEstimate breakdown.xlsxBid summary.pdf

Upload drawings and get a scoped quote for your takeoff or estimate.